APDC EXPANSION PROJECT FOR TOWN OF BETHLEHEM PLANNING BOARD: GEIS & FSEIS
Port of Albany Fact Sheet 2023223
Community Air Monitoring Program (CAMP)
CAMP Summaries
–WE2023-01-07 CAMP Public Report
–WE2023-01-14 CAMP Public Report
–WE2023-01-21 CAMP Public Report
–WE2023-01-28 CAMP Public Report
–WE2023-02-04 CAMP Public Report
–WE2023-02-11 CAMP Public Report
–WE2023-02-18 CAMP Public Report
–WE2023-02-25 CAMP Public Report
–WE2023-03-04 CAMP Public Report
–WE2023-03-11CAMP Public Report
–WE2023-03-18 CAMP Public Report
–WE2023-03-25 CAMP Public Report
–WE2023-04-01 CAMP Public Report
–WE2023-04-07 CAMP Public Report
–WE2023-04-15 CAMP Public Report
–WE2023-04-22 CAMP Public Report
–WE2023-04-29 CAMP Public Report
–WE2023-05-13 CAMP Public Report
–WE2023-05-20 CAMP Public Report
–WE2023-06-24 CAMP Public Report
–WE2023-07-01 CAMP Public Report
–WE2023-07-08 CAMP Public Report
–WE2023-07-15 CAMP Public Report
–WE2023-07-22 CAMP Public Report
–WE2023-07-29 CAMP Public Report
–WE2023-08-05 CAMP Public Report
–WE2023-08-12 CAMP Public Report
–WE2023-08-19 CAMP Public Report
–WE2023-08-26 CAMP Public Report
–WE2023-09-02 CAMP Public Report
–WE2023-09-09 CAMP Public Report
Permits
- 2023.08.31 APDC SPDES Permit
- 2023.08.31 Marmen-Welcon ASF Permit
- 2023.08.31 Port of Albany Responsiveness Summary
- AT5596CE-08-11-22 Revision 1 MWWP
- 2022.11.10 NYSDEC PoA SEQR Findings
- 2022.11.10 PoA NYSDEC Article 11 and 15 Permits
- 2022.11.10 PoA Stormwater SPDES GP UPA 2nd Exception Letter
- Landfill Reclamation Work Plan.PoA.Beacon Island Site (3)
- POA – Geotech Report – Beacon Island
- 2022-10-28_01L12211_BeaconIsland.Registration
- 6 NYCRR Part 360.15
- Public Information Mtg _Port of Albany _Dec 21 2021_ 16 hybrid access
- Presentation Combined 12-21-21 FINAL
- POA Marmen Welcon_Normanskill Rehabilitation Plans_10-27-2021
- POA Marmen Welcon_Expansion Site_Preliminary Site Plans_10-27-2021
- POA Marmen Welcon_700 Smith Blvd Preliminary Site Plans_10-27-21
- POA Marmen Welcon Offsite Improvements_Preliminary Plans_10-21-2021
- 2021_11_08_POA_SDEIS_DEC-Comms_ResponseLtr_Final
- 2021_10_27_SEQR Compliance Statement – APDC
- 2021_10_27_Ltr Response to MJ Techincal Review smb (1)
- 11_09_2021_709.26A_SDEIS_Completness_Review
- 4- FINAL SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT_10272021 (1)
Appendices:
- 05_Appendix A1_700 Smith Boulevard Risk Based PCB Remediation Application
- 05_Appendix A2_ATL_AT5596CE-05-10-20 Revision 1 SMP
- 05_Appendix A3-1_ToB SWPPP_2021-10-27
- 05_Appendix A3-2_CoA SWPPP_2021-10-27
- 05_Appendix A4_CHA_Site Management Plan_Final 05-14-2020
- 06_Appendix B_Report_Port of Albany SAV
- 07a_Appendix C_POA 2021 T-E Memo_051921_Compiled
- 07b_Appendix C_Bald Eagle Correspondence_2021
- 08_Appendix D_Report_Port of Albany Mussels
- 09_Appendix E1_2020.08.28 DEC mussel and SAV response ltr
- 09_Appendix-E2_DSEIS-Climate-and-Air-Section-DRAFT-2021-10-22
- 10a_Appendix F_POA Supplemental WDR_Complete_052121
- 10b_Appendix F1_18641.00-WETLAND DELINEATION_Compiled
- 10c_Appendix F2_POA_JPA_DEC-Comms_ResponseLtr_drSBAF
- 11_Appendix G_POA Marmen Welcon Tower Manufacturing Plant TIS_2021-10-22
- 12_Appendix H_Visual Assessment Report-SEIS Update
- 13_Appendix I_Waterfront Assessment Form 2021
- 14_Appendix J_Economic Impact Analysis – Additional October 2021
- 15_Appendix K_Public Participation Plan Final 11-9-2021
- 16_Appendix L_2021.08.13 NYSDEC Comments on POA Beacon Island Site Scoping Document
GEIS Reports
- Preliminary Geotechnical Engineering Report (CME April 2017)
- Supplemental Geotechnical Engineering Report (Dente July 2017)
- 2020–06-02 SEQR Findings Statement Final – APDC
- 2020–06-02 SEQR Resolution Adopting Findings Stmt – APDC
- APDC FEIS-Findings Notice
- FGEIS Combined – w bookmarks – 4.30.2020
- Port of Albany DGEIS – 8.15.2019
- Supplemental DGEIS – Combined with Bookmarks – 12.13.2019
FSEIS & Final Design Town Submission
- 2022_01_24_POA_Site Plan_MJ Eng Comms_ResponseLtr
- 2022-01-25 ToB SWPPP Report
-
- Combined SFEIS Submittal Clean Version 02-28-2022
- Combined SFEIS Submittal w Tracked Changes 02-28-2022
- POA Off-Shore Wind Final Design Plans – 700 Smith Blvd_2022-01-24
- POA Off-Shore Wind Final Design Plans – Expansion Site_2022-01-25
- POA Off-Shore Wind Final Design Plans – Normanskill Street Rehabilitation_2022-01-24
- POA -Smith BLVD Reconstruction_Preliminary Design Progress Plans – 2.9.22
Town ZBA Application Submission
- 18641.00-Port of Albany Parking Landscaping Areas_2022-01-14
- 18641.00-SP-00_FLOODPLAIN Figure
- 18641.00-Visual Assessment Report-SEIS Update
- BE1011-080a Waterfront Assessment Form_completed
- Bldg. A_Elevation
- Bldg. B_Elevation
- Bldg. C_Elevation
- Bldg. D_Elevation
- POA Adjacent Property Owners List
- POA Expansion Site_Town ZBA Variance Application_2022-02-03_signed
- POA Off-Shore Wind Final Design Plans – Expansion Site_2022-01-25
- POA Off-Shore Wind Final Design Plans – SP-00 Front Setback Highlight
- POA Photo Log
- Presentation Town ZBA Mtg. 03-16-22
- POA Zoning Applicaiton EAF – Part One_signed
- Presentation Town ZBA Mtg. 03-16-22
- River_Rd_309_Determination
- Town ZBA Submission Cover Letter_2022-02-08
Town Files for Signatures_2022-06-20
- POA Offshore Wind – SWPPP Report_ToB_2022-06-20
- POA Offshore Wind – Offsite Improvements Final Design Plans_2022-06-17
- POA Offshore Wind – Normanskill Street Rehab Final Design Plans_2022-06-17
- POA Offshore Wind – Expansion Site Improvements Final Design Plans_2022-06-30
Town Approval Documents
- 309 River Rd Flood Plain permit_Issued 2022-06-17
- 2022-03-15 Planning Board – Public Minutes-1965 (SEQRA Approval)
- 2022-03-16 Zoning Board of Appeals – Public Minutes-1961
- 2022–05-17 SPA 304 – 21-00100006 – APDC Marmen & Welcon, 309 River Rd, …
- Letter 2022–05-12 RL to BG re APDC LWRP Consistency
Approval Resolutions
- 2022–03-01 SEQR Resolution – APDC Final SEIS Complete FINAL
- 2022–03-15 SEQR Findings Statement APDC FINAL
City Site Plan Approval Submission Material
- 2021-11-30 LOT
- Construction Detail_2022-01-24
- DPR_2022-01-31
- Master Application_2022-01-31
- Photos
- POA – Development Plan Review Comment Responses_w Attachements_2021-01-31
- POA_Bldg E Plan-Elev – 211201
- Site Plan_2022-01-24
- Stormwater Report
- Survey 2021-10-27
Final PB Approval Submission_2022-04-21
- 18641.00 CoA SWPPP Combined
- POA 700 Smith Blvd – AWD Comment Response Letter_2022-04-21
- POA 700 Smith Bvld – Updated Site Plans_2022-04-21
Project Signoff Submission_2022-07-07
- POA Design Plans_700 Smith Blvd_2022-07-07
- POA Marmen Welcon Project – AWD Comment Response Letter_2022-06-30
Joint Application Permit
Joint Permit Application Appendices
- Appendix 01 – Permit Sketches_May_2022_8.5X11
- Appendix 02 – Interagency Pre-Application Meeting
- Appendix 03 – Agency Correspondence
- Appendix 04 – Rare Plant Species Investigation_2019
- Appendix 05 – Supplemental Rare Plant Species Investigation_2021
- Appendix 06 – Wetland Delineation Report_2019
- Appendix 07 – Supplemental Wetland Delineation Report_2021
- Appendix 08 – Submerged Aquatic Vegetation Survey
- Appendix 09 – Freshwater Mussels Survey
- Appendix 10 – Soil Management Plan
- Appendix 11 – Environmental Subsurface Inv and Soil Sampling Report
- Appendix 12 – Sediment Sampling and Analysis Report
- Appendix 13 – Vegetation Management Plan
- Appendix 14 – POA-81.6AcreSite_FireFlow_TechMemo
Air State Facilities Permit Application
- 1 – NYSDEC Air State Facility Application Package_R4 2023-03-13 (Part 1 of 2) (NH 4-12-23) STAMPED
- 1 – NYSDEC Air State Facility Application Package_R4 2023-03-13 (Part 2 of 2)
- NYSDEC Air State Facility Application Package 013122
- Marmen AERMOD Modeling File Inventory 2022-03-14
- Marmen Modeled Emission Rates and Results 2022-03-14
SPDES WWTP Permit Application
- -Non Criteria:
Hydrogenated Castor Oil:
Marmen_Hydrogenated_Castor_Oil_1-hr.bpi
Marmen_Hydrogenated_Castor_Oil_1-hr_Contour
Marmen_Hydrogenated_Castor_Oil_1-hr_EzraPrentice_Results
Marmen_Hydrogenated_Castor_Oil_1-hr_Results
Marmen_Hydrogenated_Castor_Oil_Annual.bpi
Marmen_Hydrogenated_Castor_Oil_Annual_Contour
Marmen_Hydrogenated_Castor_Oil_Annual_EzraPrentice_Results
Marmen_Hydrogenated_Castor_Oil_Annual_Results
Iron Hydroxide Oxide:
Marmen_Iron_Hydroxide_20344-49-4_1-hr.bpi
Marmen_Iron_Hydroxide_20344-49-4_1-hr_Contour
Marmen_Iron_Hydroxide_20344-49-4_1-hr_EzraPrentice_Results
Marmen_Iron_Hydroxide_20344-49-4_1-hr_Results
Marmen_Iron_Hydroxide_20344-49-4_Annual_EzraPrentice_Results
Marmen_Iron_Hydroxide_20344-49-4_Annual.bpi
Marmen_Iron_Hydroxide_20344-49-4_Annual_Results
Kaolin (Clay)
Marmen_Kaolin_(Clay)_1-hr_Contour
Marmen_Kaolin_(Clay)_1-hr_EzraPrentice_Results
Marmen_Kaolin_(Clay)_1-hr_Results
Marmen_Kaolin_(Clay)_1332-58-7_1-hr.bpi
Marmen_Kaolin_(Clay)_Annual_Contour
Marmen_Kaolin_(Clay)_1332-58-7_Annual.bpi
Marmen_Kaolin_(Clay)_Annual_EzraPrentice_Results
Marmen_Kaolin_(Clay)_Annual_Results
Lead 7439-92-1
Marmen_Lead_7439-92-1_1-hr.bpi
Marmen_Lead_7439-92-1_1-hr_Contour
Marmen_Lead_7439-92-1_1-hr_EzraPrentice_Results
Marmen_Lead_7439-92-1_1-hr_Results
Marmen_Lead_7439-92-1_Annual_Contour
Marmen_Lead_7439-92-1_Annual.bpi
Marmen_Lead_7439-92-1_Annual_EzraPrentice_Results
Marmen_Lead_7439-92-1_Annual_Results
Lead Compounds (Lead Tetraoxide)
Marmen_Lead_Compounds_(Lead_Tetraoxide)_1-hr.ADI
Marmen_Lead_Compounds_(Lead_Tetraoxide)_1-hr.ADO
Marmen_Lead_Compounds_(Lead_Tetraoxide)_1-hr_Contour
Marmen_Lead_Compounds_(Lead_Tetraoxide)_1-hr_Results
Marmen_Lead_Compounds_(Lead_Tetraoxide)_Annual.ADI
Marmen_Lead_Compounds_(Lead_Tetraoxide)_Annual.ADO
Marmen_Lead_Compounds_(Lead_Tetraoxide)_Annual_Results
Lecithin
Marmen_Lecithin_8002-43-5_1-hr.bpi
Marmen_Lecithin_8002-43-5_1-hr_Contour
Marmen_Lecithin_8002-43-5_1-hr_EzraPrentice_Results
Marmen_Lecithin_8002-43-5_1-hr_Results
Marmen_Lecithin_8002-43-5_Annual.bpi
Marmen_Lecithin_8002-43-5_Annual_EzraPrentice_Results
Marmen_Lecithin_8002-43-5_Annual_Results
Limestone
Marmen_Limestone_1317-65-3_1-hr.ADI
Marmen_Limestone_1317-65-3_1-hr.ADO
Marmen_Limestone_1317-65-3_1-hr_Contour
Marmen_Limestone_1317-65-3_1-hr_EzraPrentice_Results
Marmen_Limestone_1317-65-3_1-hr_Results
Marmen_Limestone_1317-65-3_Annual.ADI
Marmen_Limestone_1317-65-3_Annual.ADO
Marmen_Limestone_1317-65-3_Annual_Contour
Marmen_Limestone_1317-65-3_Annual_EzraPrentice_Results
Marmen_Limestone_1317-65-3_Annual_Results
Methyl-1,2,2,6,6-P-4-P
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_1-hr.ADI
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_1-hr.ADO
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_1-hr_Contour
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_1-hr_EzraPrentice_Results
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_1-hr_Results
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_Annual.ADI
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_Annual.ADO
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_Annual_Contour
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_Annual_EzraPrentice_Results
Marmen_Methyl-1,2,2,6,6-P-4-P_82919-37-7_Annual_Results
Methylstyrenated Phenol
Marmen_Methylstyrenated_Phenol_68512-30-1_1-hr.ADI
Marmen_Methylstyrenated_Phenol_68512-30-1_1-hr.ADO
Marmen_Methylstyrenated_Phenol_68512-30-1_1-hr_Contour
Marmen_Methylstyrenated_Phenol_68512-30-1_1-hr_EzraPrentice_Results
Marmen_Methylstyrenated_Phenol_68512-30-1_1-hr_Results
Marmen_Methylstyrenated_Phenol_68512-30-1_Annual.ADI
Marmen_Methylstyrenated_Phenol_68512-30-1_Annual.ADO
Marmen_Methylstyrenated_Phenol_68512-30-1_Annual_Contour
Marmen_Methylstyrenated_Phenol_68512-30-1_Annual_EzraPrentice_Results
Marmen_Methylstyrenated_Phenol_68512-30-1_Annual_Results
Mica
Marmen_Mica_12001-26-2_1-hr.ADI
Marmen_Mica_12001-26-2_1-hr.ADO
Marmen_Mica_12001-26-2_1-hr_Contour
Marmen_Mica_12001-26-2_1-hr_EzraPrentice_Results
Marmen_Mica_12001-26-2_1-hr_Results
Marmen_Mica_12001-26-2_Annual.ADI
Marmen_Mica_12001-26-2_Annual.ADO
Marmen_Mica_12001-26-2_Annual_EzraPrentice_Results
Marmen_Mica_12001-26-2_Annual_Results
Nepheline Syenite
Marmen_Nepheline_Syenite_37244-96-5_1-hr.ADI
Marmen_Nepheline_Syenite_37244-96-5_1-hr.ADO
Marmen_Nepheline_Syenite_37244-96-5_1-hr_Contour
Marmen_Nepheline_Syenite_37244-96-5_1-hr_EzraPrentice_Results
Marmen_Nepheline_Syenite_37244-96-5_1-hr_Results
Marmen_Nepheline_Syenite_37244-96-5_Annual.ADI
Marmen_Nepheline_Syenite_37244-96-5_Annual.ADO
Marmen_Nepheline_Syenite_37244-96-5_Annual_Contour
Marmen_Nepheline_Syenite_37244-96-5_Annual_EzraPrentice_Results
Marmen_Nepheline_Syenite_37244-96-5_Annual_Results
Part 182 Permit Application
- Signed_POA Part 182 Implementation agreement
Revised
2021_12_15_NYSDEC_Part_182_IncidentalTakePermitApp_v3
2022-02-24_Figure_4A_4B_S101_S301
2022-02-24_Figure_4A_4B_S101_S301_8.5X11
National Marine Fisheries Service – Biological Assessment
- 01_POA Biological Assessment_Final_ 05062022
- Appendix A_MA Verification Letter_ Northern Long-Eared Bat (NLEB) Consultation and 4(d) Rule Consistency 2022-03-15
- Appendix A2_NLEB Coordination
- Appendix B1 – Permit Sketches_May_2022_8.5X11
- Appendix B2_2022-02-24_Figure_4A_4B_S101_S301
- Appendix C_AT5596CE-02-06-20 Sediment Sampling Plan – Dredging
NY DOS Coastal Consistency
USCG – No Permit Required Letter
SHPO/THPO No Effect Determination
OGS – No Objection Letter